| MGQ | MARINE GAM QESHM | PROJECT 02 |
Auxiliary Engine Overhaul and Recommissioning
| Service Category | Auxiliary Engine Overhaul |
| Typical Location | Persian Gulf / Southern Iran |
| Project Status | Completed case-study format |
| Client / Vessel | Confidential |
| Document Use | Website project page and company presentation |
Website case-study draft: confirm vessel particulars, dates, quantities and final results against MGQ records before publication.
Project Overview
Planned overhaul of an auxiliary diesel engine to correct unstable operation, restore compression performance and improve reliability of the vessel’s onboard power-generation system.
Operational Challenge
The auxiliary engine showed difficult starting, uneven exhaust temperatures and increased lubricating-oil consumption. Continued operation could have resulted in reduced generator reliability and an increased risk of failure during port or cargo operations.
Technical Assessment
Engine records, running hours and recent alarm history were reviewed. Compression condition, injector performance, valve clearances and cooling-water condition were evaluated. The inspection plan focused on cylinder heads, fuel injectors, pistons, liners, connecting-rod bearings and associated cooling and lubrication passages.
Detailed Scope of Work
- Pre-overhaul inspection and performance review
- Removal and overhaul of cylinder heads
- Inspection and servicing of fuel injectors
- Valve, seat and guide inspection
- Piston and liner condition checks
- Connecting-rod bearing inspection and clearance verification
- Cleaning of cooling and lubricating-oil passages
- Renewal of selected gaskets, seals and consumable parts
- Valve-clearance adjustment and engine timing checks
- Reassembly, pre-lubrication, test run and load monitoring
Execution Methodology
The engine was dismantled in accordance with the approved work sequence. Components were cleaned, measured and inspected against maker guidance and service limits available onboard. Cylinder-head valves and seats were serviced, injectors were checked, and clearances were recorded before reassembly. The engine was then pre-lubricated, barring checks were completed, and the unit was started under controlled conditions before gradual load application.
HSE Controls
The work area was isolated and kept free of ignition sources and oil contamination. Heavy components were handled using certified lifting arrangements. Fuel and lubrication systems were protected from foreign material throughout the overhaul.
Quality Assurance and Inspection
Critical clearances, tightening values and replaced parts were documented. During testing, exhaust temperatures, lubricating-oil pressure, cooling-water temperature, load sharing and abnormal noise were monitored.
Project Outcome
The auxiliary engine returned to stable operation with improved starting, balanced exhaust temperatures and satisfactory load performance. The vessel’s generating capacity was restored without requiring removal of the engine from the vessel.
Typical Close-Out Deliverables
- Overhaul report
- Measurement and clearance sheet
- Parts replacement record
- Test-run readings
- Photographic work record
Recommended Website Project Summary
Auxiliary Engine Overhaul and Recommissioning was executed by Marine Gam Qeshm through a structured repair process covering technical assessment, controlled execution, inspection and operational testing. The project demonstrates MGQ’s ability to mobilize skilled marine technicians, coordinate with vessel personnel and complete critical repair work with attention to safety, quality and operational continuity.
Recommended Website Highlights
- Rapid technical mobilization
- Clear repair planning and reporting
- Skilled marine engineering support
- Controlled HSE and quality procedures
- Inspection, testing and documented handover