Project Overview

Planned overhaul of an auxiliary diesel engine to correct unstable operation, restore compression performance and improve reliability of the vessel’s onboard power-generation system.

Operational Challenge

The auxiliary engine showed difficult starting, uneven exhaust temperatures and increased lubricating-oil consumption. Continued operation could have resulted in reduced generator reliability and an increased risk of failure during port or cargo operations.

Technical Assessment

Engine records, running hours and recent alarm history were reviewed. Compression condition, injector performance, valve clearances and cooling-water condition were evaluated. The inspection plan focused on cylinder heads, fuel injectors, pistons, liners, connecting-rod bearings and associated cooling and lubrication passages.

Detailed Scope of Work

Execution Methodology

The engine was dismantled in accordance with the approved work sequence. Components were cleaned, measured and inspected against maker guidance and service limits available onboard. Cylinder-head valves and seats were serviced, injectors were checked, and clearances were recorded before reassembly. The engine was then pre-lubricated, barring checks were completed, and the unit was started under controlled conditions before gradual load application.

HSE Controls

The work area was isolated and kept free of ignition sources and oil contamination. Heavy components were handled using certified lifting arrangements. Fuel and lubrication systems were protected from foreign material throughout the overhaul.

Quality Assurance and Inspection

Critical clearances, tightening values and replaced parts were documented. During testing, exhaust temperatures, lubricating-oil pressure, cooling-water temperature, load sharing and abnormal noise were monitored.

Project Outcome

The auxiliary engine returned to stable operation with improved starting, balanced exhaust temperatures and satisfactory load performance. The vessel’s generating capacity was restored without requiring removal of the engine from the vessel.

Typical Close-Out Deliverables

 

 

Recommended Website Project Summary

Auxiliary Engine Overhaul and Recommissioning was executed by Marine Gam Qeshm through a structured repair process covering technical assessment, controlled execution, inspection and operational testing. The project demonstrates MGQ’s ability to mobilize skilled marine technicians, coordinate with vessel personnel and complete critical repair work with attention to safety, quality and operational continuity.

Recommended Website Highlights

Suggested Call to Action

Need support for a similar repair? Contact Marine Gam Qeshm to discuss the vessel condition, location, available repair window and required technical scope.

Leave a Reply

Your email address will not be published. Required fields are marked *