Project Overview
Fabrication and installation of structural steel items and local reinforcement for a vessel repair project.
Operational Challenge
Damaged and weakened structural members required replacement and reinforcement. New components had to be fabricated to suit existing geometry and installed without creating unacceptable distortion or interference.
Technical Assessment
The repair area was measured and existing structure was checked for alignment and access. Templates and fabrication sketches were prepared from verified dimensions. The welding sequence and lifting method were planned before installation.
Detailed Scope of Work
- Site measurement and fabrication planning
- Preparation of templates and cutting lists
- Fabrication of brackets, inserts, supports and reinforcement pieces
- Edge preparation and fit-up
- Controlled welding and distortion management
- Grinding and finishing of completed joints
- Visual inspection and NDT where specified
- Preparation of repaired surfaces for coating
Execution Methodology
Steel components were fabricated in the workshop, trial-fitted and adjusted before final installation. Fit-up was verified for alignment and accessibility. Welding was carried out in stages using suitable sequence and restraint. Completed welds were cleaned and inspected before release.
HSE Controls
Hot work, lifting, grinding and work-at-height controls were implemented. Fire watch and ventilation were maintained, and surrounding equipment was protected from sparks and heat.
Quality Assurance and Inspection
Dimensions, fit-up and weld quality were checked throughout the work. Inspection results and any corrective actions were recorded in the project report.
Project Outcome
The repaired structure was restored to a stable and serviceable condition. Fabricated items were installed within the required dimensions and the area was prepared for final coating.
Typical Close-Out Deliverables
- Fabrication and installation report
- Dimensional check record
- Welding inspection record
- NDT report where required
- Photo documentation
Recommended Website Project Summary
Structural Fabrication and Hull Welding Works was executed by Marine Gam Qeshm through a structured repair process covering technical assessment, controlled execution, inspection and operational testing. The project demonstrates MGQ’s ability to mobilize skilled marine technicians, coordinate with vessel personnel and complete critical repair work with attention to safety, quality and operational continuity.
Recommended Website Highlights
- Rapid technical mobilization
- Clear repair planning and reporting
- Skilled marine engineering support
- Controlled HSE and quality procedures
- Inspection, testing and documented handover